The Project

The Victoria Palace Theatre – London

Client: JCT Traditional
Contract Duration: 91 Weeks

We have been instructed by out client Build 8 to re-decorate this stunning theatre. The original building (The Royal Standard) was demolished in 1910 and in its place was built, at a cost of ₤12,000, the current theatre, The Victoria Palace which opened in 1911. Works commenced in July 2017 and will last approximately six months, the work includes specialist painting including gold leaf.

Contract value £580,000

http://www.8build.co.uk/project/victoria-palace-theatre/